1) the generation capacity (in MWdays) of each thermal and
hydro generator;
2) the sum of the starting position plus inflows minus releases (H
+ spill) from all previous periods must be greater than the
minimum reservoir levels of each hydro unit;
3) the sum of the starting position plus inflows minus releases (H
+ spill) from all previous periods must be less than the maximum
reservoir level of each hydro unit;
4) the starting reservoir levels;
5) the finishing reservoir targets;
6) demand must be satisfied at each point in time;